Do you want to know more about Stora Enso?
Tidiness and order are prerequisites for safe work. Once the work is completed, the contractor must remove from the worksite all temporary structures and scaffolding, installation equipment and waste and leave the area in a safe state.
The party carrying out the work is responsible for waste sorting and for taking it to the collection point. The work is ready when the final clean-up of the worksite is completed. Hazardous waste must be separated from other materials to avoid safety risks and the contamination of the other materials so that they become unusable.
Waste that can be used as material:
Energy material:
Other:
Landfill fractions:
Hazardous waste is separated, marked and packaged appropriately and carefully.
For the duration of shutdowns, the number of collection bins and pallets will be increased as needed and they will be emptied more frequently. The locations of additional bins are communicated in the info session before shutdown or investment work begins. If the clean up has to be performed by Stora Enso, the contractor will invoiced for the clean-up in question.